Trans 210.03(1) (1) “Department" means the Wisconsin department of transportation.
Trans 210.03(2) (2) “Major highway project" has the meaning given in s. 84.013 (1)(a), Stats.
Trans 210.03(3) (3) “Transportation projects commission" has the meaning given in s. 13.489, Stats.
Trans 210.03(4) (4) “Level of service" or “LOS" means the ability of the facility to satisfy both existing and future travel demand. Six levels of service are defined for each type of highway facility ranging from A to F, with LOS A representing the best operating conditions and LOS F the worst.
Trans 210.03 History History: Cr. Register, January, 1999, No. 517, eff. 2-1-99.
Trans 210.04 Trans 210.04Goals. The department shall use this process to evaluate a proposed major highway project in terms of its ability to enhance Wisconsin's economy, improve highway service, improve highway safety, minimize environmental impacts, and serve community objectives.
Trans 210.04 History History: Cr. Register, January, 1999, No. 517, eff. 2-1-99.
Trans 210.05 Trans 210.05Minimum requirement. Proposed major highway projects having traffic flow or safety deficiencies shall receive a minimum requirement score of 10 points. Only these projects shall be eligible for recommendation to the transportation projects commission. Traffic flow or safety deficiencies shall exist if either of the following conditions are satisfied:
Trans 210.05(1) (1) The predicted level of service on significant portions of the highway shall be worse than level of service C. Department engineers shall use the appropriate methodologies to determine the projected level of service that is predicted to exist 20 years from the year of the analysis.
Trans 210.05 Note Note: Department engineers will use the procedures outlined in the general design consideration guidelines in Chapter 11, Section 5 of the Facilities Development Manual published by the Wisconsin Department of Transportation to determine the level of highway service. Copies of the manual may be obtained by writing to or calling the Division of Investment Management, Bureau of State Highway Programs, P.O. Box 7913, Room 933, Madison, WI 53707-7913, (608) 267-7715.
Trans 210.05(2) (2) Safety on significant portions of the highway shall be worse than the statewide average for a similar highway type. Safety shall be identified by the number of crashes or the severity of crashes using any one of the following:
Trans 210.05(2)(a) (a) The crash rate, which shall be calculated by the total number of crashes divided by the number of hundred million vehicle miles traveled over the length of the highway segments.
Trans 210.05(2)(b) (b) Severity proportion, which shall be calculated by dividing the number of fatality and incapacitating injury crashes by total crashes over the length of the highway segments.
Trans 210.05 Note Note: The crash rates and severity proportions are objective measures which are based on principles found in the Highway Safety Evaluation Procedural Guide, Docket No. FHWA-TS-81-219, published by the Federal Highway Administration. A copy of the Guide can be reviewed by writing or calling the Safety and Traffic Operations Engineer at the Federal Highway Administration, 567 D'Onofrio Drive, Madison, WI 53719, (608) 829-7519.
Trans 210.05 History History: Cr. Register, January, 1999, No. 517, eff. 2-1-99.
Trans 210.06 Trans 210.06Measures. Measures shall be used to quantify the effect of the proposed major highway project on the highway system or the communities that will be affected by the project. These measures shall contribute points beyond the minimum score and will be used to place projects in relative rank order. The department shall numerically evaluate proposed major highway projects in the following 5 categories:
Trans 210.06(1) (1)Economic measure.
Trans 210.06(1)(a)(a) The department shall evaluate each proposed major highway project's ability to increase the competitiveness of the existing businesses through all of the following:
Trans 210.06(1)(a)1. 1. Comparison of the reduction in long-term travel costs to the cost of constructing and maintaining the proposed major highway project. The reduction in travel costs may include, but is not limited to, vehicle operating cost savings, travel time savings and accident savings. The calculation of the score for this economic measure component shall be based on each proposed major highway project's points relative to the proposed major highway project with the highest number of points in this category. These points shall contribute to 37.5% of the total 100 points allowable for the economic measure score. The following formula shall be used to determine the score for this component:
Benefit Cost Ratio Score = [(B/C) / (B/Cmax) ](100) (.375)
where:
B/C = the ratio of reduction in long-term travel costs to the cost of constructing and maintaining the proposed major highway project.
B/Cmax = the highest ratio of reduction in long-term travel costs to the cost of construction and maintenance for any proposed major highway project under consideration for enumeration in that year.
Trans 210.06(1)(a)2. 2. Evaluation of the existing businesses that will benefit from the proposed major highway project, which may be measured by the number of business entities, and the amount of employment, population and tourism in the proposed or existing highway corridor. Greater consideration shall be given to businesses that are projected to have significant growth over a majority of the life of the proposed highway project.
Trans 210.06(1)(b) (b) An evaluation shall be made for the proposed major highway project's ability to attract new businesses through:
Trans 210.06(1)(b)1. 1. Consideration of the proposed major highway project's potential to increase the productivity of industry along the highway corridor.
Trans 210.06(1)(b)2. 2. Consideration of the business redistribution potential of the proposed major highway project. Greater consideration shall be given to proposed major highway projects that do not redistribute growth from one part of the state to another, and to projects that contain businesses with the ability to attract business from outside of the state.
Trans 210.06(1)(b)3. 3. Consideration of the economic development strengths of the communities served by the project. Greater consideration shall be given to communities that are sufficiently organized to capitalize on the economic opportunities associated with the proposed major highway project.
Trans 210.06(1)(b)4. 4. Consideration of unique regional differences in the economic need and abilities of the communities affected by the proposed major highway project.
Trans 210.06(1)(c) (c) An evaluation shall be made of the proposed major highway project's ability to improve connections between economic centers. Greater consideration shall be given to those routes that are either part of Wisconsin's corridors 2020 network of quality highways, or part of the national highway system.
Trans 210.06 Note Note: Copies of Corridors 2020 or National Highway System maps can be obtained by writing to or calling the Division of Investment Management, Bureau of State Highway Programs, P. O. Box 7913, Room 933, Madison, WI 53707-7913, (608) 267-7715.
Trans 210.06(2) (2)Traffic flow measure.
Trans 210.06(2)(a)(a) The department shall evaluate the existing and predicted traffic flow on the highway system that will be affected by the proposed major highway project. Traffic flow shall be measured using accepted engineering practices to compute the level of service on the highway system segments, and may consider traffic density, travel speed or time delayed and other related factors.
Trans 210.06(2)(b) (b) Greater consideration shall be given to the severity of congestion and to the amount of traffic that is on the existing highway system segments that would be affected by the proposed major highway project.
Trans 210.06(2)(c) (c) The calculation of the traffic flow measure points shall be based on a combination of the existing and predicted levels of service, weights for the levels of service and the number of existing and predicted vehicle miles traveled on the highway segments affected by the proposed major highway project. Points will be calculated for individual highway segments within the highway system affected by the major highway project. The total points for the major highway project is equal to the sum of the points for the highway segments. The following formula shall be used to determine the traffic flow measure points:
Traffic Flow Measure Points =
 
[ (LOS0 ) (W) (%HMVMT0 ) (2/3) ] +
  [ (LOS10) (W) (%HMVMT 10) (1/3) ]
where:
LOS0 = the numeric value of the existing level of service on the highway segment.
LOS10 = the numeric value of level of service that is predicted to exist on the highway segment 10 years from the analysis year. The following table shows the numeric LOS values. - See PDF for table PDF
W = weight applied to LOS numerical values, based on the following categories of LOS: - See PDF for table PDF
%HMVMT0 = hundred million vehicle miles traveled over the highway segment for the existing year divided by the hundred million vehicle miles traveled over the affected highway system for the existing year.
%HMVMT10 = hundred million vehicle miles predicted to occur over the highway segment in the 10th year from the analysis year, divided by the hundred million vehicle miles predicted to occur over the affected highway system in the 10th year from the analysis year.
Trans 210.06(2)(d) (d) The calculation of the traffic flow measure score shall be based on each proposed major highway project's traffic flow points relative to the proposed major highway project with the highest number of traffic flow points. The following formula shall be used to determine the traffic flow measure score:
Traffic Flow Measure Score = (Traffic Flow Points/ Traffic Flow Pointsmax) (100)
where:
Traffic Flow Points = the traffic flow measure points for the proposed major highway project, as computed using procedures in sub. (2)(c).
Traffic Flow Pointsmax = the highest number of traffic flow measure points given to any proposed major highway project under consideration for enumeration in that year, as computed using procedures in sub. (2) (c).
Trans 210.06 Note Note: Department engineers will use the procedures outlined in the general design consideration guidelines in Chapter 11, Section 5 of the Facilities Development Manual published by the Wisconsin Department of Transportation to determine the level of highway service. Copies of the manual may be obtained by writing to or calling the Division of Investment Management, Bureau of State Highway Programs, P. O. Box 7913, Room 933, Madison, WI 53707-7913, (608) 267-7715.
Trans 210.06(3) (3)Safety measure.
Trans 210.06(3)(a)(a) The department shall evaluate the number of crashes as well as the severity of the crashes that exist on the highway system affected by the proposed major highway project through:
Trans 210.06(3)(a)1. 1. Determining the crash rate which shall be calculated by the total number of crashes divided by the number of hundred million vehicle miles traveled over the length of the highway system segments.
Trans 210.06(3)(a)2. 2. Computing the severity proportion which shall be calculated by dividing the number of fatality and incapacitating injury crashes by the total crashes on the highway system segments.
Trans 210.06(3)(b) (b) Consideration shall be given to those crash rates and severity proportions that are significantly above the statewide average for similar highway types.
Trans 210.06(3)(c) (c) An evaluation of the number and severity of crashes shall include as many historical years as necessary to determine a reliable average.
Trans 210.06(3)(d) (d) An evaluation shall be made to determine if the proposed major highway project will affect the safety of pedestrians and bicyclists. A proposed project that will increase speeds on the existing highway without providing for improved pedestrian and bicyclists facilities will be scored lower.
Trans 210.06(3)(e) (e) The calculation of the safety measure points shall be based on the crash rate, severity proportion, and the hundred million vehicle miles traveled on the highway segments affected by the proposed major highway project. Points will be calculated for individual highway segments within the highway system affected by the major highway project. The total points for the major highway project is equal to the sum of the points for the highway segments. The following formula shall be used to determine the safety measure points:
Safety Measure Points =
  [ (CR + SP) (%HMVMT) (100) ] - P
where:
CR = the crash rate points given for crash rates that are significantly above the statewide average for similar highway types. The following table shows the points given for the categorical ranges of crash rates. - See PDF for table PDF
SP = the severity proportion points given for severity proportions that are significantly above the statewide average for similar highway types. The following table shows the points given for the categorical ranges of severity proportions. - See PDF for table PDF
%HMVMT = hundred million vehicle miles traveled over the highway segment for the existing year divided by the hundred million vehicle miles traveled over the affected highway system for the existing year.
P = 10 if the highway is currently used by pedestrians or bicycles, and will result in increased speeds on the existing facility without providing for improved bicycle and pedestrian facilities, or = 0 for those projects that are not used by bicycles and pedestrians, or will not result in increased speeds, or where improved bicycle and pedestrian facilities are planned.
Trans 210.06(3)(f) (f) The calculation of the safety measure score shall be based on each proposed major highway project's safety measure points relative to the proposed major highway project with the highest number of safety points. The following formula shall be used to determine the safety measure score.
Safety Measure Score = (Safety Points/ Safety Pointsmax) (100)
where:
Safety Points = the safety measure points for the proposed major highway project, as computed using procedures in par. (e).
Safety Pointsmax = the highest number of safety measure points given to any proposed major highway project under consideration for enumeration in that year, as computed using procedures in par. (e).
Trans 210.06 Note Note: The crash rates and severity proportions are objective measures which are based on principles found in the Highway Safety Evaluation Procedural Guide, Docket No. FHWA-TS-81-219, published by the Federal Highway Administration. A copy of the Guide can be reviewed by writing or calling the Safety and Traffic Operations Engineer at the Federal Highway Administration, 567 D'Onofrio Drive, Madison, WI 53719, (608) 829-7519.
Trans 210.06(4) (4)Environmental measure.
Trans 210.06(4)(a)(a) The department shall evaluate environmental considerations associated with the proposed major highway project through a draft environmental impact statement or environmental assessment. The draft environmental impact statement or environmental assessment shall provide summary information which shall be used to determine the potential net effects the proposed major highway project may have on environmental resources.
Trans 210.06(4)(b) (b) The net environmental effects will be computed by comparing the potential effects of the build alternatives to the no build alternative.
Trans 210.06(4)(c) (c) A proposed major highway project that will affect relatively more natural resources including, but not limited to, wetlands, uplands, flood plains, stream crossings and endangered species, shall be scored lower.
Trans 210.06(4)(d) (d) A proposed major highway project that will affect relatively more physical resources including, but not limited to, air quality, sound quality, and contaminated sites, shall be scored lower.
Trans 210.06(4)(e) (e) A proposed major highway project that will affect relatively more socio-economic resources including, but not limited to, agricultural land, park land, residential and business development, shall be scored lower.
Trans 210.06(4)(f) (f) A proposed major highway project that will affect relatively more cultural resources including, but not limited to, historic properties and archeological sites, shall be scored lower.
Trans 210.06 Note Note: Environmental data will be collected from the environmental summary matrix provided in the draft environmental impact statement or the environmental assessment for specific impacts which apply to natural, physical, socio-economic and cultural resources.
Trans 210.06(5) (5)Community input measure.
Trans 210.06(5)(a)(a) The department shall evaluate community support or opposition to a proposed major highway project through:
Trans 210.06(5)(a)1. 1. Determining community support or opposition from local and regional officials, associations, merchants and residents through informational hearings and correspondence. Greater consideration shall be given for input that is based on the project's overall impact on the community or region.
Trans 210.06(5)(a)2. 2. Determining if the proposed major highway project is consistent with metropolitan, local or regional transportation plans that have been adopted or reaffirmed in the last 5 years. A transportation plan may include a comprehensive plan that contains a transportation component.
Trans 210.06 History History: Cr. Register, January, 1999, No. 517, eff. 2-1-99.
Trans 210.07 Trans 210.07Weights applied to measures. Weights for each of the 5 measures shall be included in the calculation of the composite score as described in s. Trans 210.08. Where necessary, sub-weights shall be applied to components of the measures prior to the determination of the score for the overall measure. The values and effect of both the overall measure weights and the component sub-weights are shown in Figure 1.
Trans 210.07 History History: Cr. Register, January, 1999, No. 517, eff. 2-1-99.
Trans 210.08 Trans 210.08Composite score.
Trans 210.08(1) (1)Computation of composite score. A combination of the 5 measures, weights for each of the measures and the minimum requirement shall be used to calculate a composite score for each proposed major highway project. Each measure shall have a maximum score of 100 points. The composite score shall have a maximum of 110 points. The following formula shall be used to determine the composite scores:
Composite Score = - See PDF for diagram PDF0 (10 + - See PDF for diagram PDF1 economic measure score + - See PDF for diagram PDF2 traffic flow measure score + - See PDF for diagram PDF3 safety measure score + - See PDF for diagram PDF4 environmental measure score + - See PDF for diagram PDF5 community input measure score)
where:
Loading...